- Topics: Active | Unanswered
Pages: 1
Topic closed
#1 2012-08-22 09:50:37
- **_batkobiker_**
upgrade from v8 to v9 Invalid byte 3 of 3-byte UTF-8 sequence
I'm trying to upgrade our dev server from v8 (patch 8.2.2) to v9 but something went wrong.
The AC service starts, but stays in not ready mode. (if I open the console or web page I see the not ready message)
C:\Connect\logs\support\debug.log
[08-22 16:29:52] WrapperStartStopAppMain (ERROR) Invalid byte 3 of 3-byte UTF-8 sequence.
C:\Connect\logs\support\diagnostic\edge.00.log
2012-08-22 16:35:31 1692 (w)2641213 Connection rejected by server. Reason : [ Server.Reject ] : Registry connection rejected, this adaptor is _defaultRoot_ and the registry only accepts connections on originhost -
system logs
--> Wrapper Started as Service
Java Service Wrapper Standard Edition 32-bit 3.3.9
Licensed to Adobe Systems Inc for ConnectPro Server 8.0
Launching a JVM...
Connection rejected by server. Reason : [ Server.Reject ] : Registry connection rejected, this adaptor is _defaultRoot_ and the registry only accepts connections on originhost
Offline
#2 2012-08-24 03:22:28
- **_batkobiker_**
Re: upgrade from v8 to v9 Invalid byte 3 of 3-byte UTF-8 sequence
This issue has been logged as bug # 3045436
The problem was with the laguage files.
For v 9.0.0.1 replace them with http://www2.arnes.si/~mbatic7/ac/langADOBE.zip and the issue will be resolved.
Offline
Pages: 1
Topic closed